Describe and organize a task

Name a task, add notes in Markdown, set priority, labels, assignee, size and reversibility, move it to a project, and break it into subtasks.

These are the properties that say what a task is and where it belongs. Open a task to change them; see The task panel for the layout. Dates and reminders have their own page: Dates, repeats and reminders.

Title#

Click the title at the top of the panel, or press E. Type the new name and press Enter or click Save title. Press Esc or click Cancel to throw the change away. A title is one line of up to 500 characters; an empty title keeps the old one.

Description#

Description holds notes, written in Markdown.

  1. Click the notes area.
  2. Type. The Write and Preview switch above the box shows how the Markdown will look. Code block fences the selected text, or adds an empty block at the cursor.
  3. Click Save, press Cmd+Enter on a Mac or Ctrl+Enter on Windows, or click outside the box. Cancel or Esc discards the draft.

A counter under the box shows the length out of 16,384 characters.

Markdown here covers headings, bold, italic and strikethrough, links, bulleted, numbered and checklist items, quotes, tables, code blocks and rules. Raw HTML shows as text, an image shows as a link, and only web, email and Yipadoo links are clickable.

The Description block of an open task with the notes editor open, the Write and Preview switch, a Code block button, Save and Cancel buttons and a character count

Priority#

Pick High, Medium, Low or No priority. With a task open or selected, the keys 1, 2, 3 and 4 set the same four levels. In Quick Add, type p1 to p4.

Labels#

Labels group tasks across projects. The Labels row shows the task's labels and an Add chip. Click it, and a list of your labels opens; click a label to put it on the task or take it off. If you have none, the list says "No labels yet. Make one under Labels." In Quick Add, type %name. See Labels.

Assignee#

Assignee shows a button for each person who can take the task, and No one. Click a person to assign the task, or No one to clear it. The row appears only when someone besides you could take the task, and guests of a workspace cannot be assigned tasks. In Quick Add, type +name.

Project and Move to#

The Project row at the top of the panel shows where the task lives. Choose another project from it to move the task there.

You can also open the Task actions menu, then Move to, then a project. For a project with sections, pick No section or a section's name. A toast reads Task moved with Undo.

A few rules apply:

  • You can move a task only into a project you can change, or into the Inbox.
  • A task in a team workspace can move only to other projects of that workspace.
  • Moving your own task into a team project cannot be undone, and the task then belongs to the workspace.
  • A subtask moved this way leaves its parent.
  • In a project whose work rules gate Hard tasks, only a workspace admin (or a personal project's owner) can move a Hard task out of it.

Parent task and subtasks#

A subtask is a smaller task inside a larger one.

  • Add one. While the Subtasks block is empty it shows only an Add subtask button; click it to open the block. Then type in the field that says "Add a subtask" and click Add subtask. Each subtask has its own checkbox. A block that has subtasks opens by default; when you fold it, its heading line summarizes progress, for example "2 of 5 subtasks done". Click a subtask's name to open it. The arrow buttons move it up or down.
  • Choose a parent. On any task, Parent task is a search field that says "No parent. Search tasks…". Pick a task, and this task becomes its subtask. The X next to it (Remove parent) makes it a normal task again.
  • Another project. If the parent is in a different project, a line says "This task will move to" that project, and you confirm with Move or back out with Cancel.
  • In a project list. Ctrl+] makes the selected task a subtask, Ctrl+[ brings it back out, and Shift+E shows or hides a task's subtasks.

Size#

Size says how big a task is: Quick win (about 10 minutes), Small (about half an hour), Medium (about an hour) or Big (half a day or more). Click a size to set it, and click it again to clear it.

For a Big task, Break it into steps? opens a field that says "A small first step". Type a step and click Add step; each step becomes a subtask.

Note: Size needs Pro or a Team seat. On Free the row still shows, but saving a size is refused with a message that says it requires Pro.

Reversibility and blast radius#

Reversibility says whether the work can be taken back: Easy to undo or Hard to undo. Blast radius says who it reaches if it goes wrong: Just me, Team, Customers or Public. Both sit in the Plan group after Waiting on. Click a value to set it, and click it again to clear it. They work on every plan.

A new task can start with values from its project's work rules. Where those rules gate Hard tasks, a Hard task needs a sign-off or an Accepted decision before it can be completed, and only an admin can lower it to Easy. See Hard to undo and sign-off.